Electrical Information

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
Title Number Description Author*
Power Distribution Pedestal BFS-14 Power distribution pedestal detail COHBFS
Load Calculations Single family residential load calculation work sheet. COHBFS
Light Pole E-101 Requirements for a bolted light pole base foundation including grounding up to a 40-foot high pole. SNBO
Temp Power E-102 Temporary power pole detail. SNBO
Mobile Home Electric Service E-103 Manufactured home electrical service pedestal. SNBO
Light E-104 Detail for the installation of a landscape light pole up to 10-foot high. SNBO
Temporary Power Service E-105 Temporary construction power provided through the main electric building service for a single family dwelling SNBO

*The author indicates the group or organization that prepared the document and is responsible for its contents and maintenance.

  • SNBO: Southern Nevada Building Officials
  • COHBFS: City of Henderson Department of Building and Fire Safety
  • COHCD: City of Henderson Community Development Department.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer